Build a grounded first-cost picture for your exhibition stand.
Select the project details below to calculate the components supported by ESG's estimating data and create a structured brief. Items without a completed pricing rule are held for consultation rather than estimated from placeholder figures.
Brief context
These fields help shape the follow-up brief. They do not directly change the budget range.
Stand basics
Core project factors. ESG supplied floor, labour and delivery rates, but not a complete base stand-build rate.
Design and layout
Common design components from the spreadsheet logic template.
Technical requirements
Power, data, AV, lighting and accessibility requirements.
Logistics and operations
Build window, derig, post-event services, venue responsibility and shell-scheme offsets.
Brand assets
Upload placeholders for production. These are captured for the brief and do not change the confirmed subtotal.